Controlled Environments Construction, Inc. installed two 40 ton Low-Charge Ammonia refrigeration units in San Pedro, CA for a client. The building was an existing cold storage facility that required the ability to hold product at -5°F. The building is approximately 28,000 square feet.
This is a great example of the flexibility of the next generation of Low Charge Refrigeration system.